The problem
Kaveri wanted a film that placed their Worli tower inside the city rather than isolating it – which meant flying in south and central Mumbai, sitting under the approach corridors for both Santacruz and Juhu, with red and yellow zones covering most of the useful frame.
Add coastal salt haze that kills contrast by 08:30, a five-day window fixed by the client's launch calendar, and a brief that specified a continuous rising reveal which cannot be cheated in post.
What we did
We spent eleven days on clearances before a single shoot day. Seven Digital Sky filings, two BMC location permissions, one Coast Guard notification for the Worli sea-face segment, and building-owner consent for three rooftop launch points.
Every shoot day started at 05:15 for a 06:05 first flight, giving roughly 100 minutes of usable haze-free light. Rohan flew the hero reveal on a cine-lift with a full-frame body and a second aircraft shadowing as a backup camera – on a five-day window with no reshoot slack, redundancy is cheaper than a lost dawn.
Sneha graded the film in HDR with a custom LUT built to hold the specific quality of Mumbai's early light, which goes warm and then flat very quickly.
The outcome
The rising reveal was captured in a single unbroken take on the fourth morning – the first three were lost to haze, a rotor-wash abort and one permission that arrived late.
The film opened Kaveri's campaign and ran as the anchor asset across their microsite, sales gallery and paid media. Site walk-ins rose 38% in the first fortnight of the campaign against the preceding month.
“The launch film did what four months of hoardings could not. Rohan's team understood the building before they understood the brief.”
Meera Krishnan, Head of Marketing, Kaveri Realty
What we delivered
- 3-minute graded brand film in HDR
- 60s, 30s and 15s cutdowns, horizontal and vertical
- 120 retouched aerial stills
- Licensed score with commercial-use certificate
- All ungraded 5.4K originals
Similar site?
If your project looks like this one, we can usually quote it from a satellite view and a ten-minute call.
Request a Flight3:00
Finished runtime
5
Dawn shoot days
7
Airspace clearances filed
38%
Rise in site walk-ins
On site at Mumbai
Ready to get your project in the air?
Tell us the site, the deliverable and the deadline. We will come back with a written scope, a clearance timeline and a fixed price - usually within one working day.