Construction & Infrastructure in India
Construction disputes are almost always disputes about measurement and timing. How much earth moved, when the retaining wall actually went up, whether the drain was laid before or after the levels changed. A monthly aerial record answers those questions with a dated, georeferenced photograph instead of two conflicting site diaries.
Our infrastructure clients typically start with a one-off survey and move to a monthly cycle within a quarter, because the value is in the series rather than any single flight.
What we fly for Construction & Infrastructure
Monthly progress mapping
Orthomosaic, DTM and cut-fill volumes flown against permanent control, so month-to-month numbers are genuinely comparable.
Earthwork volumetrics
Stockpile and cut-fill computation with a stated confidence interval, suitable for RA bill certification.
Corridor surveys
Linear mapping for highway, metro, canal and transmission alignments, delivered as CAD-ready corridor models.
Safety and compliance record
Dated photographic evidence for environmental clearances, CRZ segments and statutory inspections.
Clash and as-built checking
Point cloud capture of what was actually built, differenced against the design model.
Claim and dispute evidence
An independent, timestamped record that both sides of a contract can measure from.
Why teams pick us
- Aerial volumes shortened RA bill certification from 19 days to 6 on our NH-66 programme
- Permanent control monuments make month-on-month comparison genuinely valid
- No lane closures, no scaffolding, no working-at-height permit
- Deliverables land in DWG, LandXML and Civil 3D, not a proprietary viewer
42km
Longest corridor programme
22
Consecutive monthly cycles
2
Claims settled on our record
Construction & Infrastructure work
Construction & Infrastructure case studies
Ready to get your project in the air?
Tell us the site, the deliverable and the deadline. We will come back with a written scope, a clearance timeline and a fixed price - usually within one working day.